Welcome to Guilin HCM Machinery Official WebSite!

0773-3568321 mkt@hcmilling.com

Moderate adjust the grinding process conditions to give full play to the effect of grinding aids


Release date: 2017-02-27 16:34:24

Cement grinding system composed into an organic system from the ingredients, pre-broken to grinding.

The requirements of the ingredients is mainly material uniform and stable, accurate measurement, the moisture of mixture, low temperature of clinker.

The pre-crushing requirements are: to reduce the size of the feeding material, reduce the load of the mill, to create conditions for high capacity of cement equipment.

The requirements of cement equipment and powder are to improve load of mill. The loading of the grinding body should be appropriately higher than the mill design load, about 10% increase, but not more than 15%. Through a reasonable with the ball, a reasonable use of wind (to prevent air leakage), the application of cement grinding aids, give full play to the production potential of the mill to achieve the purpose of high quality and high yield.

General cement plant cement grinding system, without the use of grinding aids before the adjustment has been adjusted to the state, that is, the grinding process of the process parameters are reasonable, the mill production is also higher. When the grinding agent is added, it has a good dispersion effect on the cement fine powder particles of the grinding silo, so that the agglomeration of the grinding chamber is greatly reduced, the fine powder particles can be discharged in time, the material flow rate is accelerated, The ball ratio and the cycle load changes, the original balance is broken. At this point, should be in the improvement of the process parameters under the premise of increasing the feed volume, to achieve a higher level of grinding system in the new balance.

After the use of grinding aids, many companies have reduced the amount of clinker, increase the amount of mixed materials. When the moisture content of the mixture is large while no drying measures are taken, the increased mixture will be brought into the water makes the integrated moisture increase and affect the output of the mill. So the use of grinding aids will help cement equipment increase the capacity for sure.